Slater Dome Field
On production, averaging 1.1 MMCFD with all existing wells on line. Existing coal bed methane production from the extensive coal measures within the Mesaverde Group.
Independently Certified Reserves Proven 15.6 BCF and 2P reserves of 35.2 BCF. Additional Resources of 234 BCF of 3P reserves associated with the Slater Dome Gas Field (500 well locations).